Safe Work Method Statement
Roofing: replace guttering and downpipes, two-storey dwelling
Roofing: replace guttering and downpipes, two-storey dwelling
Version 1
Issued 19 Oct 2026
Issued 19 Oct 2026
| Step | Hazards | Controls | Risk |
|---|---|---|---|
| 3. Erect mobile scaffold on driveway | Scaffold collapse, falls during erection, struck by vehicles | Scaffold erected by competent person to AS/NZS 1576, outriggers fitted, driveway closed with bollards and signage | High → Low |
| 5. Remove old gutter sections from boom lift | Fall from EWP basket, dropped objects, contact with overhead power | Harness to AS/NZS 1891.1 clipped to anchor, exclusion zone below, 3 m clearance from service lines confirmed | Extreme → Low |
Plus PPE, permits, legislation, emergency arrangements, monitoring and a sign-on register. 9 steps in total for this job.